We build for the future
Finished

CTPark Bor u Tachova: Halls B7, B10, B11, B12, B12R

Project description

PSG supplied and installed the precast reinforced concrete structural frame for a complex of industrial buildings with integrated one- and two-storey facilities designed for production, warehousing and logistics. The total footprint of the buildings is 221,000 m². The project was delivered in phases, including Buildings B10 and B12 (2015–2016) and Buildings B7, B11 and B12R (2019–2020).

  • Investor
    CTP Invest, spol. s r.o.
  • Place
    Bor u Tachova
  • Project duration
    01/2015 - 12/2020
  • Type of project
    Reinforced Concrete Structures
  • Supplier
    PSG a.s.

Our recent projects

All references